您好, 歡迎來到智慧城市網(wǎng)! 登錄| 免費注冊| 產(chǎn)品展廳| 收藏商鋪|
產(chǎn)品詳情資料
DCS系統(tǒng)安裝的外部條件
1、 控制室和操作室應(yīng)具備使用條件:
在安裝前,控制室和操作室的土建、安裝、電氣、裝修工程全部完工,室內(nèi)裝飾符合設(shè)計要求,空調(diào)機啟用,并配有吸塵器;
其環(huán)境溫度、濕度、照明度及空氣的凈化程度符合DCS系統(tǒng)運行條件才可開箱安裝。
2、 對安裝人員的要求:
安裝人員保持清潔,到控制室或操作室工作換上干凈的拖鞋,已防灰塵進入DCS系統(tǒng)裝置內(nèi);
要盡量避免靜電感應(yīng)對系統(tǒng)元器件的影響,調(diào)試時,不穿化纖等容易產(chǎn)生靜電的織物。
機、柜、盤運輸與安裝
機、柜、盤要求整體運輸?shù)娇刂剖?,安裝前拆箱。
DCS系統(tǒng)硬件包裝箱在運輸、開箱、搬運時小心,防止傾倒和產(chǎn)生強烈振動,以免造成意外損失。
開箱時要有設(shè)備供應(yīng)部門人員和接、保、檢部門人員在場共同檢查外觀質(zhì)量、設(shè)備內(nèi)部卡件接線的缺陷、系統(tǒng)隨機帶來的文件、資料等,并做好記錄,簽字確認。
DCS系統(tǒng)控制室通常有500mm左右的防靜電、防潮地板,因此要考慮好底座高度,并保證其穩(wěn)定性和強度。
英文產(chǎn)品詳細信息
External conditions for DCS system installation
1. The control room and operation room should have the following conditions for use:
Before installation, the civil, installation, electrical, and decoration works of the control room and operation room must be completed, and the indoor decoration must meet the design requirements. The air conditioning unit must be activated and equipped with a vacuum cleaner;
Only when the ambient temperature, humidity, lighting level, and air purification level meet the operating conditions of the DCS system, can they be unpacked for installation.
2. Requirements for installation personnel:
The installation personnel must maintain cleanliness, and when working in the control room or operation room, they must wear clean specialized slippers to prevent dust from entering the DCS system device;
Avoid the impact of Electrostatic induction on system components as much as possible. During debugging, do not wear chemical fibers and other fabrics that are prone to static electricity.
Transportation and installation of machines, cabinets, and panels
The machine, cabinet, and panel are required to be transported as a whole to the control room and unpacked before installation.
The DCS system hardware packaging box must be carefully transported, unpacked, and handled to prevent tipping and strong vibration, in order to avoid accidental losses.
When opening the box, personnel from the equipment supply department, as well as personnel from the reception, maintenance, and inspection departments, should be present to jointly inspect the appearance quality, defects in the internal card wiring of the equipment, documents and materials randomly brought by the system, and make records and sign for confirmation.
The DCS system control room usually has an anti-static and moisture-proof floor of about 500mm, so it is necessary to consider the height of the base and ensure its stability and strength.
免責(zé)聲明:
AMIKON我們銷售新產(chǎn)品和停產(chǎn)產(chǎn)品,獨立渠道購買此類特色產(chǎn)品。阿米控不是本網(wǎng)站特色產(chǎn)品的授權(quán)分銷商、經(jīng)銷商或代表。本網(wǎng)站上使用的所有產(chǎn)品名稱/產(chǎn)品圖片、商標(biāo)、品牌和徽標(biāo)均為其各自所有者的財產(chǎn)。帶有這些名稱,圖片、商標(biāo)、品牌和徽標(biāo)的產(chǎn)品描述、描寫或銷售僅用于識別目的,并不表示與任何權(quán)利持有人有任何關(guān)聯(lián)或授權(quán)。
ABB | Honeywell | Woodward |
CS31 ECZ FPR3700001R0001 | C7076A1015 | 9905-463 |
ICSI16E1 FPR3316101R1032 | C7061F2001 | 5463-785 |
ICSK20F1 FPR3327101R1202 | ACX633 51196655-100 | 5463-473 |
PP836A 3BSE042237R2 | ACX631 51198947-100 | 5464-414 |
3BHB004744R0010 XVC517 | 942-M0A-2D-1G1-220S | 5464-544 |
NGPS13C 3AUA0000042489 | 942-A4M-2D-K220S | 5463-581 |
PP235 3BSC690102R2 | 900H03-0102 | 5464-013 |
DSTD110A YB161102-AM | 900G32-0001 | 5464-211 |
請輸入賬號
請輸入密碼
請輸驗證碼
以上信息由企業(yè)自行提供,信息內(nèi)容的真實性、準(zhǔn)確性和合法性由相關(guān)企業(yè)負責(zé),智慧城市網(wǎng)對此不承擔(dān)任何保證責(zé)任。
溫馨提示:為規(guī)避購買風(fēng)險,建議您在購買產(chǎn)品前務(wù)必確認供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。