您好, 歡迎來到智慧城市網(wǎng)! 登錄| 免費(fèi)注冊| 產(chǎn)品展廳| 收藏商鋪|
一、根據(jù)滑觸線現(xiàn)場情況,本文就DMHX-200A-L滑觸線為例,滑觸線采購好后,根據(jù)廠家提供的說明說,進(jìn)行安裝。先將角鋼支架按照1.25米的距離焊接或者固定在行車軌道壓板底下。
A sliding contact line, according to the situation of field, in this paper, DMHX-200A-L sliding contact line as an example, the sliding contact line buy good, according to the instructions provided by the manufacturers say, installation. The first angle bracket according to the distance of 1.25 meters of welding or fixed on the lane rail clips underneath.
二、固定好角鋼支架后,在角鋼支架下面安裝好提掛架和固定架。
Two, fixed angle steel bracket, installed and fixed in the frame of the rack angle provided below the bracket.
三、之后再將行車滑觸線固定在提掛架和固定架之下,并安裝好動力輸入,各滑觸線連接點(diǎn)的鋁接頭,之后安裝接頭護(hù)套和端冒。
Three, then driving sliding contact line is fixed on the rack and a fixing bracket provided below, and installed power input, aluminum joint of each sliding contact line connection point, after the installation of the sheath and the end joint at.
四、集電器安裝,將集電器支架焊接在行車的標(biāo)準(zhǔn)位置,將集電器穿入集電器支架上,并調(diào)整好集電器與行車滑觸線的平行距離。
Four, electrical installation, the collector welding bracket in the standard location of traveling, the collector is penetrated into the collector on the bracket, and adjust the distance of parallel good collector and driving sliding contact line.
行車滑觸線調(diào)試。各項(xiàng)設(shè)備安裝好后,要進(jìn)行滑線調(diào)試準(zhǔn)備。用設(shè)備保持好角鋼支架的平行,各滑線不彎曲。之后,通電測試行車運(yùn)行。
Crane sliding contact line commissioning. The equipment after installation, must carry on the slip line debugging preparation. Using the special equipment to maintain a good angle bracket in parallel, each slide line does not bend. After the power on test running.
請輸入賬號
請輸入密碼
請輸驗(yàn)證碼
以上信息由企業(yè)自行提供,信息內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由相關(guān)企業(yè)負(fù)責(zé),智慧城市網(wǎng)對此不承擔(dān)任何保證責(zé)任。
溫馨提示:為規(guī)避購買風(fēng)險,建議您在購買產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。